"Eisener Steg" across the Glan, Meisenheim
Steel framework construction
Construction project:
"Eisener Steg"
Pedestrian bridge across the Glan in Meisenheim
Description of works:
Following the existing structure, the completely welded construction was executed with vertical members and diagonal tension braces. The truss upper chords are arched. In the bottom chord plane as well as as in 2/3 of the top chord plane braced bays have been arranged. The foot path has plank covering.
Deliveries/works:
Donges fabricated, delivered and erected the steel construction including corrosion protection and plank covering.




