2nd Main bridge, Marktheidenfeld
suspended deck composite arch bridge
Construction project:
Kreisstraße MSP45 mit Neubau der 2. Mainbrücke Marktheidenfeld
Owner:
Landkreis Main-Spessart Stadt Marktheidenfeld
Description of works:
The river bridge was executed as a suspended deck composite arch bridge with crossed hangers and composite roadway deck slab. The steel construction was pre-assembled completely and then pushed into final position with a self-propelled platform trolley. The roadway deck slab was constructed with precast slabs and in-place concrete complement.
Deliveries/Works:
Donges fabricated, delivered and erected the complete steel structure, including corrosion protection