BW 111/54, AS Sömmerda
Steel composite bridge
Construction project:
Bridge in the course of the B 176 over motorway BAB A71, AS Sömmerda, BW 111/54
Owner:
Autobahnamt Thüringen, Erfurt
Description of works:
Composite bridge with four parallel steel hollow box girders. The hollow boxes are curved vertically, with a constant-radius horizontal layout.
Deliveries/Works:
Donges fabricated, delivered and erected the complete steel structure, including corrosion protection.





