Isar bridge Plattling
Suspended deck composite arch bridge
Construction project:
Renewal of the river bridge and conversion of the foreland bridge of the Plattling Isar bridge in the course of highway B8 Regensburg - Passau
Owner:
Straßenbauamt Deggendorf
Description of works:
The new river bridge is a 3-span continuous beam system with the tied arch above the river opening and a tee beam in the outer spans. The steel construction is erected behind an abutment in “timed shifting” and then incrementally launched”.
Deliveries/Works:
Donges fabricated, delivered and erected the complete steel structure, including corrosion protection.





