River bridge over the Unstrut, L 214, Memleben
2-span composite deck bridge
Construction project:
Bridge in the course of the L 214 over the Unstrut near Memleben
Owner:
Straßenbauverwaltung Land Sachsen-Anhalt, represented by Straßenbauamt Halle
Client:
HMB, Halle
Year of constr.:
2000/2001
Description of works:
The steel composite superstructure is haunched in the support area and is laid out with a transition from the straight to a radius of 70 m. The prefab transport sections were preassembled and lifted in with a large crane.
Deliveries/Works:
Donges fabricated, delivered and erected the complete steel structure, including corrosion protection.





