Suspended deck composite arch bridge
Lichterfelder Wassertorbrücke, Eberswalde
Construction project:
Replacement new building of the Lichterfeld Wassertorbrücke, Eberswalde
Description of works:
The suspended deck arch bridge was executed with a rf concrete roadway deck slab in composite construction.
The steel construction was pre-assembled completely behind an abutment and then pushed into position longitudinally with pontoon support.
Deliveries/Works:
Donges fabricated, delivered and erected the complete steel structure, including corrosion protection.





